How to carry out defoaming construction of self le

2022-07-22
  • Detail

The construction of self leveling cement must be carried out continuously, and no cross construction is allowed within 24 hours. After the mixing of self leveling cement is completed, it should be poured into the construction site as soon as possible. If the self leveling of 2mm thickness is done, it can be scraped with a self leveling rake, because the rake can evenly control the construction thickness of self leveling; If you want to do self leveling of more than 3mm, you can use a large self leveling spatula. After the self leveling is scraped on the ground, you should use a defoaming roller to deflate as soon as possible. The scraping and defoaming construction personnel must wear spiked shoes. The construction of self leveling cement is to retreat back while construction, and pay attention to the height drop between each barrel of self leveling cement

detailed inquiry: http://www.hebeiqicheng.com

Mobile: 15350835289 13784879731

长春牛皮癣医院

连云港男科医院

成都哮喘医院

Copyright © 2011 JIN SHI